# Monitoring and documentation of the project
# Upscaling plan?
 
====3R WUMP process====
 
Helvetas SI Nepal will work in close collaboration with RAIN, the 3R consortium and the Rainwater harvesting capacity centre Nepal in developing and testing (with the VDCs) the module, as well as in setting up the training. Once a first training has been given, the (training) module will be refined. After a second training has been given, field testing of the module will be done. The process will be monitored and documented throughout the project time frame.
 
====Swot analysis====
 
Here is a [http://en.wikipedia.org/wiki/SWOT_analysis SWOT analysis] of the project:
 
{| style="border: 1px #06A5D1; background-color: #EDEDED;"
|-
|'''Strengths:''' <br>
* Integration of the 3R approach into a proved model (WUMP)
* High level of outreach through network of RAIN and through network of Helvetas SI Nepal
* ...
|'''Weaknesses:''' <br>
* Convincing decision makers of cost-effectiveness can be cumbersome (high initial investments of applying the module that result into lower infrastructure investment)
* The WUMP/3R is a planning tool. This does not imply automatically that the planned interventions are followed by the necessary resources.
* …
|-
|'''Opportunities:'''
* Possible outscaling to other countries where Helvetas and / or RAIN are active
* …
* …
|'''Threats:''' <br>
* …
* …
* …
|-
|}
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor