Changes

no edit summary
<font size="2" color=#06A5D1>'''Project period:''' Implementation runs October 2012 up to December 2013. <br>
Documentation and learning will take a longer time, possibly until the end of 2014.<br>A plan for research and documentation via satellite imagery is currently being developed together with [http://www.metameta.nl/ MetaMeta].</font>
==Pilot challenge==
* Capacity building in 3Rs for the community and district local government officials.
 
====SWOT analysis====
 
Here is a [http://en.wikipedia.org/wiki/SWOT_analysis SWOT analysis] (Strengths, Weaknesses, Opportunities, and Threats) of the project:
 
{| style = "border: 1px solid #06A5D1" cellspacing="3" cellpadding="5" align="top"
|-
|style="color:black; background-color:#EDEDED;"|'''Strengths:''' <br>
* Work is ongoing, there are very capable people on the ground
* Local community is very cooperative
* High project potential due to sufficient rainfall and good soils for retention and recharge
|style="color:black; background-color:#EDEDED;"|'''Weaknesses:''' <br>
* Difficult to provide exact measures of success: unknown number of springs will appear due to the fact that underground conditions cannot be part of calculations.
* ...
* ...
|-
|style="color:black; background-color:#EDEDED;"|'''Opportunities:'''
* Easy project with a lot of different technologies to work on that might inspire people in the region
* Environmental programs are in high demand
* Program has a high potential to be expanded
|style="color:black; background-color:#EDEDED;" | '''Threats:''' <br>
* Not understanding the benefits of environmental upgrading on water supply might induce a lack of interest to do the work
* ...
* ...
* ...
|-
|}
 
 
{|border="1" cellpadding="5"
|-
! scope="col" |
! scope="col" |Current situation
! scope="col" |Expected results
! scope="col" |Actual results
|-
|'''Water supply'''
|Dried up springs and shallow wells, people are now depending on open source of water such as the wetland.
|Several springs revived, improvement of soil and water retention for 150000 M2 agricultural land.
|
|-
|'''MUS'''
|Drinking water plus sufficient water for increased agricultural production on small irrigated plots.
|Better soil moisture for agricultural land
|
|-
|'''3R'''
|Recharge
|Recharge of water table uphill and slower drainage into wetland
|
|-
|'''Business development'''
|Yam production near the sources, which will increase income
|Environmental sustainability of these plantations
|
|}
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits