====Building the sand dam (and wing wall)====
[[Image:SandDamConstruction.JPG|thumb|right|200px|Sand dam under construction. Somaliland. Eric Fewster, BushProof / Caritas]]
[[Image:CompletedSandDam.JPG|thumb|right|200px|Completed sand dam. Somaliland. Eric Fewster, BushProof / Caritas]]
* Timing is important: dams should be built during the dry season, but don’t build dams too close to the rains in order to avoid the trench filling up with water or the dam being washed away.
* The method depends on the type of dam and the type of ground. The construction of sand dams in cascades improves total storage and efficiency and minimizes seepage losses. Dams made of concrete, stone-masonry (cheapest and easiest) and brickwork require skilled labour for construction, but are stronger and have a longer lifespan.
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits