Horizontal cistern

144 bytes added, 21:52, 20 May 2013
Costs
First a hole is dug for the cistern. It should be less deep in the area where the vault is and deeper on one end where the pump will be. Then the arch shaped cover for the vault is manufactured using sticks and mud as a mold. The cover is made of 2 layers of cement, with stones in between. The cement is left to dry for 4 days. The walls of the cistern are then built, with layers of mud and cement of different thicknesses. Then the walls, curbstone, cover and pump are installed in the other section, in a similar way to how it is done with the vertical cistern.
==Costs== Costs can be divided as such: 1/3 = cost of materials; 1/3 = cost of transport, labour, etc.; and 1/3 = cost to cover failures, or replacements.
==Field Experiences==
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits