Changes

Natural ground catchment and Open water reservoir

95 bytes added, 18:07, 6 April 2012
Construction, operations and maintenance
====Size the pond====
[[Image:SmallNaturalPond.JPG|thumb|right|400px|Small, natural pond for rainwater harvesting.]]
Pond size (and therefore dam height) can be decided according to water demand, evaporation & seepage losses, length of critical period and average stream flow according to the following:
* Determine water requirement (R litres/day)
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits