Changes

KARI

352 bytes added, 04:39, 30 May 2012
Construction, operations and maintenance
==Construction, operations and maintenance==
'''System components'''<br>
 
* 200-litre drum with opening at one end or cut open ∫” gate valve (control valve) ∫” x 6 m plastic water pipe
* 4 x ∫” PVC tees
* 3 x ∫” PVC bends
* 5 filter plugs
* 10 x 0.5 m lengths of flexible tubing
* 10 barb x drip lock fittings
* 10 x 15 m drip irrigation tubes
* 10 drip tube end closures.
 
'''Assembly instructions'''<br>
Akvopedia-spade, akvouser, bureaucrat, emailconfirmed, staff, susana-working-group-1, susana-working-group-10, susana-working-group-11, susana-working-group-12, susana-working-group-2, susana-working-group-3, susana-working-group-4, susana-working-group-5, susana-working-group-6, susana-working-group-7, susana-working-group-8, susana-working-group-9, susana-working-group-susana-member, administrator, widget editor
30,949
edits